Project Located in Antalya Konyaaltı, Kepez and Döşemealtı Districts; Belediye Street, Ataturk Boulevard, Akdeniz Boulevard, Gazi Mustafa Kemal Boulevard, 24th Street, Ahmet Vefik Paşa Street, Düden Street, Suleyman Demirel Boulevard, Düden Street, Antalya Boulevard, Ataturk Street, Meltem Boulevard, Yıldız Street and Tonguç Street.

 

The project was completed in 7 stages.

 

PART 1 = Belediye Street consists of 5 roundabouts with a length of 2.6 km.

PART 2 = Atatürk Avenue and Akdeniz Boulevard consist of 8 crossroads with a length of 10 km.

PART 3 = Gazi Mustafa Kemal Boulevard and 24th Street consists of 3.5 km long and 5 intersections.

PART 4 = Ahmet Vefikpaşa Street, Şelale Street, üuleyman Demirel Boulevard and Düden Street consists of 12.5 km long 16 intersections and 12.5 km cycle path (25.630 m2 bicycle path).

PART 5 = Antalya Boulevard consists of 3 intersections and 3 km of bicycle path (15.000 m2 bicycle path) in 3 km long section.

PART 6 = Atatürk Street consists of 12 km long junction and 12 km bicycle path (31,200 m2 bicycle path).

PART 7 = Meltem Boulevard, Yıldız Street and Tonguç Street consist of 4 intersections with a length of 3 km.

 

61 Intersection, 45 km; road, infrastructure, static, electricity and landscape application projects were prepared.